PROJECT OVERVIEW

  1. Solar Farm in Bintan. 400MW solar in top-soil depleted mining areas, which ensure low cost of solar. Scaleable to 1200 MW peak solar for future.

  2. Management of Intermittency: Solar power generated during the day needs to be managed for intermittency and stbility to ensure stable power to electroyser (green H2) plant

  3. Power Transmission: Uses existing grid and the redundant transmission lines to move power from across Riau Islands Indonesia to electrolyser facility in Bintan.

  4. Hydrogen production facility: Start with 600 MW electrolyser capacity in 2027, which is scalable to 1800 MW by 2032, all of this will be based on renewable power. 

  5. Export to Singapore: Green gaseous hydrogen will be exported using subsea pipelines from Indonesia to Singapore, where the the gaseous hydrogen will used as a fuel for green power generation, with net zero emissions.